⚖️ Government of India Scheme Information Portal | Updated Daily

Home › Updates

PM-KUSUM Yojana

PM-KUSUM helps farmers replace diesel pumps and unreliable grid power with solar energy — at 60% subsidy. Farmers can install standalone solar pumps, solarise existing grid-connected pumps, or even earn money by setting up small solar plants on barren land and selling power to the DISCOM.

The three components

ComponentWhat it offers
A — Solar plants on landFarmers/groups set up 0.5–2 MW plants on barren/fallow land and sell power to the DISCOM
B — Standalone solar pumpsUp to 7.5 HP off-grid solar pumps replacing diesel pumps
C — SolarisationExisting grid-connected pumps get solar panels; surplus power is sold back

Subsidy structure (Components B & C)

  • 30% central subsidy + 30% state subsidy — farmer pays roughly 40%
  • Bank finance available for most of the farmer share, so upfront cash can be ~10%
  • Higher central support (up to 50%) applies in North-Eastern states, hill states and island territories

Who should apply

  • Farmers running diesel pumps — solar pays back fastest by killing fuel costs
  • Farmers in areas with poor daytime power supply
  • Landowners with barren land near a substation (Component A income opportunity)
  • FPOs, cooperatives and panchayats can apply for group installations

How to apply

  1. Applications run through your state nodal agency (energy department/DISCOM/agriculture department portals) — each state opens application windows
  2. Register with land records, Aadhaar, bank details and existing pump/connection details
  3. After sanction, an empanelled vendor installs the system
  4. Pay only your farmer share; subsidy flows directly to the vendor/agency

Beware of fake KUSUM websites — apply only via official state portals listed here.

Frequently asked questions

Which pump size do I need?

Depends on your water depth and acreage — 3 HP suits shallow water tables and small plots; 5–7.5 HP for deeper borewells and larger areas. The state agency validates sizing.

Are there fake KUSUM portals?

Yes — several fraud sites collect “registration fees”. The scheme charges no online registration fee; verify every link on pmkusum.mnre.gov.in.

What maintenance do solar pumps need?

Mainly panel cleaning and basic care; vendors provide 5-year comprehensive maintenance under the scheme norms.

Related schemes

Disclaimer: PMYojnaUpdates.com is an independent information portal, not affiliated with any government department. Always verify details on the official site pmkusum.mnre.gov.in before applying.